We Chuzhou Jincheng Metalwork Co., Ltd, one of biggest manufactucturers of scaffoldings in China with 2 factories to make steel and aluminum seperately , all located in Chuzhou City, very close to Nanjing.
Please see aluminum products we have already produced right now, new products are continue to be added but might not list one by one. Only show you some regular and selling most for reference.




Chuzhou Jincheng Metalwork Co., Ltd is a big and leading scaffolding manufacturer near 17 years.
Most of our products are sold to North America, South America, UK, Australia and Singapore etc with high quality and competitive prices.
We main produce ringlock system scaffoldings, cuplock scaffolding system, kwikstage scaffolding system, steel plank, shoring, frame type scaffoldings, prop, screw jack, cross brace and relevant scaffolding components.
With continious effeort and development, our new big factory was build and runing at August 2015.
And we start to use robots to weld some scaffoldigng products, such as frames, steel plank instead of welders to improve our working efficient and save times, so our delivery will be shortened in some degree.




All products we made are matched ISO9001:2015,EN3834-2 and EN1090 steel struction welding quality system, even some products are tested by SGS or TUV on aspects of loading bearing capacity or chemical analyse etc.



Please see aluminum products we have already produced right now, new products are continue to be added but might not list one by one. Only show you some regular and selling most for reference.




Chuzhou Jincheng Metalwork Co., Ltd is a big and leading scaffolding manufacturer near 17 years.
Most of our products are sold to North America, South America, UK, Australia and Singapore etc with high quality and competitive prices.
We main produce ringlock system scaffoldings, cuplock scaffolding system, kwikstage scaffolding system, steel plank, shoring, frame type scaffoldings, prop, screw jack, cross brace and relevant scaffolding components.
With continious effeort and development, our new big factory was build and runing at August 2015.
And we start to use robots to weld some scaffoldigng products, such as frames, steel plank instead of welders to improve our working efficient and save times, so our delivery will be shortened in some degree.




All products we made are matched ISO9001:2015,EN3834-2 and EN1090 steel struction welding quality system, even some products are tested by SGS or TUV on aspects of loading bearing capacity or chemical analyse etc.


